Tender design, preliminary and full detailed design including execution drawings for three mined station caverns, adits and shafts. Additionally, construction support services on site were provided.
Estimated cost: Commencement:
March 01, 2012
Completion date:
Ongoing
Location:
529 Albert St
Ottawa, ON K1R 7Z0
Canada
Technical data:
Geology description:

The geology varies from strong limestone to competent and fractured shale. A soft ground section includes highly disturbed glacial sand/silt/clay deposits with a high water table.

Geology types:
Activity:
Categories:
Bid cost: Final cost:
$3 billion CAD
Service areas:
Tunneling under:
Tunnel length:
2.5km
Description

The confederation Line in Ottawa encompasses 15 stations and stops; its centre piece is a 2.5km long tunnel with three underground stations underneath downtown Ottawa. The mined construction method for the stations was chosen in order to minimize the impacts to the surface. The underground stations are located directly adjacent to existing, sensitive and sometimes historic buildings requiring detailed studies of risks during construction and risk mitigation measures.

Cavern conrstruction under way
Downtown stations located between high-rise buildings
Mined Caverns directly adjacent to existing basements
Special Excavation Sequenes incorporating pre-tensioning
Large-Scale 3D Numerical Modelling incorporating the surroundigs