Owner
                                
                                
                                    
            Ben Gurion University
      
                                
                             
                                                                            
                                
                                    Client
                                
                                
                                    
            Ben Gurion University
      
                                
                             
                                                                            
                                                                            
                                
                                    Timeframe
                                
                                
                                    January 2020
                                                                             — June 2020
                                                                                                        
                             
                                                                            
                                
                                    Services performed
                                
                                
                                    
            Dr. Sauer & Partners provided design checking services and acted as expert advisor for construction methodology, structural assessment, and waterproofing design.
      
                                
                             
                                                                            
                                
                                    Description
                                
                                
                                    
            As part of the development of the North Campus, Ben-Gurion University is planning to build a utility tunnel to connect the buildings that will be constructed. The tunnel alignment is planned to be under the future Northern Campus road with a total length of approx. 1,000 m with a rectangular shaped tunnel section. A cross-section widening is planned in areas where the tunnel connects to a building. The construction method planned is Cut & Cover, which shall include dewatering and slurry walls. 
      
                                
                             
                                                                            
                                
                                    Geology
                                
                                
                                    
            The soil section relevant to the project comprises subgrade fill, silty sand to silty clay (Loess), and calcareous sand to sandstone. 
      
                                
                             
                                                                            
                                
                                    Location
                                
                                
                                    
            Be'er Sheva, Israel